07 January 2013

P L U M B I N G . E L E C T R I C A L


holidays and rain delays coupled with an added 4 week window lead time has focused our (very slow) forward
progress on the interiors. because the client wanted to purchase all fixtures, outlets, lighting, and appliances
independently, it has made drawing coordination for heights and sizes more difficult and resulted in a lot of
drawing holes directly onto walls. but all of the plumbing and electrical is prepped for outlets and fixtures and the
tortoise-esque speed has allowed us to point out potentially awkward conditions and interactions (like the
housing sizes and placement for integral lighting or the heights of the wall mounted toilets below) that we are
crossing our fingers will get resolved cleanly.





20 December 2012

S H E A T H E D


sheathing complete. just in time for the holiday. i rather miss the light streaming through the rafters.






10 December 2012

F R A M I N G . 3


with part of the exterior sheathing and the north elevation fascia backing up, a real house is starting to take form.
the interior walls and ceilings are framed giving us the first real sense of the space outside the 3d model. even
though the square footage was kept to a minimum, the organization of the program and the high ceilings help
to make the spaces feel much larger. 









03 December 2012

D E L A Y


rain, wet wood, and mud. lots of it.



26 November 2012

F R A M I N G . 2


coming together. we had some framing issues, but phil was great about fixing the errors so that the overall
roof form would maintain the design intent. having a 3d model of both the design and the structural framing
has been invaluable in being able to communicate and work through issues. as detailed as we make our
drawings, very few people understand three dimensional objects in two dimensional representation. an image
can make complexity clearer and zooming around a 3d model can sometimes perform magic.




19 November 2012

F R A M I N G . 1

this week was the first week of framing. we are still working out our window order with metal window corp
since we had to adjust the height of all our windows by 6 inches due to our building height issue. seeing 
the basic outline of the house go up has helped reaffirm some of the rapid changes we had to make on the fly. 
overall, we struck a nice balance between cost and as much glazing as possible by maintaining relatively 
standard sizing and minimizing the operable elements of our large openings. metal window corp has been super 
helpful in working out the details for many of our mulled conditions and maintaining the thinnest profiles possible 
for our frames.









12 November 2012

S L A B


the pex tubing for the radiant heat in the floor slab was tied to the rebar and then insulated before pouring the
interior footings and slab. the tracks for the sliding doors and drains in the bathroom are seamless, so we
integrated the recess into the pour to eliminate the need for cutting through the slab later. the footing reveal
turned out well.