19 November 2012

F R A M I N G . 1

this week was the first week of framing. we are still working out our window order with metal window corp
since we had to adjust the height of all our windows by 6 inches due to our building height issue. seeing 
the basic outline of the house go up has helped reaffirm some of the rapid changes we had to make on the fly. 
overall, we struck a nice balance between cost and as much glazing as possible by maintaining relatively 
standard sizing and minimizing the operable elements of our large openings. metal window corp has been super 
helpful in working out the details for many of our mulled conditions and maintaining the thinnest profiles possible 
for our frames.