12 November 2012

S L A B


the pex tubing for the radiant heat in the floor slab was tied to the rebar and then insulated before pouring the
interior footings and slab. the tracks for the sliding doors and drains in the bathroom are seamless, so we
integrated the recess into the pour to eliminate the need for cutting through the slab later. the footing reveal
turned out well.