real walls for a real house. drywall returns at every edge - windows, doors, etc. - and no baseboard. one of the
very first details we drew and insisted on was the reglet reveal wall base detail that is common in museums and
galleries. this allows the walls to float slightly above the finished concrete floor, parroting the concrete reveal that
levitates the overall house volume, and eliminating the need for baseboard. everywhere.
polyurethane spray foam insulation went into our roof cavity. at R6 per inch this meant we only needed 5 inches
of foam to meet R30. it also meant we could eliminate all ridge and soffit vents in the roof to maintain a seamless
transition of the metal at various edges. despite looking like scary yellow industrial slime clinging to the rafters,
spray foam, once expanded, is actually non-toxic and will prevent many of the mold and mildew issues prevalent
with batt.
the window walls of the north facade open up the interior to the exterior yard as much as shear calculations
would allow. fully pocketing glass doors were prohibitively expensive so we used a combination of sliding and
fixed panel glazing to work in tandem with the slatted wood screen that will sit in front: all of the panels operate
within the 3ft module established by the slat screen batons and sliders tuck behind fixed panels where the
screen shades for privacy.
all of the panels fit into a single assembly, without any intermittent framing.a big thank you goes to mark
martinez at metal window corp who worked with us to get the mull and recessed (flush) track details right. the
track fit perfectly into the groove framed out during the slab pour and once the finished concrete topping is added,
the transition between the interior rooms and exterior landing will be seamless.
the metal window corp windows arrived. a perfect order, not a single return (thanks to mark at mwc and daniel at
sbs in glendale). all are framed in white aluminum except for the rear elevation which is black anodized to fit into
the zinc siding. originally they were designed to be floor to ceiling operables without a horizontal mull, but both
the budget and the city said no. because two of the windows are fire egress, large fixed glass panels were not an
option either. to stay consistent, we created a mull line for all windows at 3ft a.f.f. with fixed panels below and
casements/awnings above, each maintaining the absolute minimum frame width possible. all of the windows
come pre-configured so there is no additional framing or mulling that occurs on site. this allows for a cleaner
install without secondary framing members but means they are extremely heavy for phil to lift into place.
waterproofing went on during (another) rain. we used a higher quality membrane than the building paper typical in
residential construction so that it would double as air barrier / underlayment for the metal roofing. the original
system we designed to - the vmzinc dexter panel - comes with its own underlayment to effectively weep water
away from the zinc, as it is highly corrosive with water. this would have been in addition to a separate air barrier.
when the system was ve'd we wanted a single layer to work both as the vapor retarder and air barrier for the metal
roof - which will have a high thermal absorption, high thermal conductivity, and low reflectivity. although our
weather is exceptionally mild, at 40mm thick, the membrane will help keep the heat on the metal and out of the
interior during the summer.
an excellent overview of underlayments for metal roofing can be found here: metal roofing underlayments
holidays and rain delays coupled with an added 4 week window lead time has focused our (very slow) forward
progress on the interiors. because the client wanted to purchase all fixtures, outlets, lighting, and appliances
independently, it has made drawing coordination for heights and sizes more difficult and resulted in a lot of
drawing holes directly onto walls. but all of the plumbing and electrical is prepped for outlets and fixtures and the
tortoise-esque speed has allowed us to point out potentially awkward conditions and interactions (like the
housing sizes and placement for integral lighting or the heights of the wall mounted toilets below) that we are
crossing our fingers will get resolved cleanly.